Sierra Dental

Sierra Dental

The Sierra Dental project was site work for this facility and completed by our Sierra Vista Team. The team included Ben Carter, John Drake, Cesar Acuna, Rick McMahon, and Ramon Morales. The scope of work included installation of SWPPP BMP’s, removal of existing...
La Estancia Phase 7

La Estancia Phase 7

The scope of work included; earthwork, underground, concrete, and paving as part of New Development of 100 Lots for Richmond American Homes. Unique challenges: This project was built off of a 10-year-old set of plans that had been prepared by a firm that was no longer...
Caterpillar Tinaja Hills Drainage Realignment

Caterpillar Tinaja Hills Drainage Realignment

This project was to bring the existing private property site drainage way up to regulation standards.  The scope included replacing existing drainage channel with the larger concrete-lined channel, relocating the existing haul road, adding two new culvert crossings of...
Kostka & Michigan Sewer Realignments

Kostka & Michigan Sewer Realignments

The Kostka & Michigan Sewer Realignments Project was awarded to KE&G by PCRWRD in February 2015. The project consists of replacing an 8-in waterline; installing, removing and replacing, and abandoning 13 manholes; installing 562 feet of new sewer main;...