Skip to content

Projects

Benson Plane Barns

This project consisted of clearing and grubbing the site, subgrade prep which was minimal due to the site being relatively flat. There was a total of 44 column footings that required over excavation with a 5ft blow out on each side. This was completed using a backhoe and wackers. The slab was constructed of 5”…

Read More

Sierra Dental

The Sierra Dental project was site work for this facility and completed by our Sierra Vista Team. The team included Ben Carter, John Drake, Cesar Acuna, Rick McMahon, and Ramon Morales. The scope of work included installation of SWPPP BMP’s, removal of existing parking lot & improvements, cut to export 5400 CY, 100’ 4” sewer with clean-outs,…

Read More

La Estancia Phase 7

The scope of work included; earthwork, underground, concrete, and paving as part of New Development of 100 Lots for Richmond American Homes. Unique challenges: This project was built off of a 10-year-old set of plans that had been prepared by a firm that was no longer in business.  KE& G had to work closely with…

Read More

Caterpillar Tinaja Hills Drainage Realignment

This project was to bring the existing private property site drainage way up to regulation standards.  The scope included replacing existing drainage channel with the larger concrete-lined channel, relocating the existing haul road, adding two new culvert crossings of 6 EA 72″ CMP culverts, constructing a new concrete inlet structure, new riprap outflow, and re-pave…

Read More

INA ROAD AT SR-77 INTERSECTION IMPROVEMENT

KE&G working for the Pima County Department of Transportation in conjunction with the Regional Transportation Authority, Town of Oro Valley, and Arizona Department of Transportation; the Ina Road at SR77 (Oracle Road) project is nearing completion. This will be the first ever indirect left intersection to be constructed in the state of Arizona. This intersection…

Read More

ADOT SR-90 (SR-92 to Giulio Cesare Avenue)

Awarded in September 2014 by the City of Sierra Vista, this project runs along SR-90 and begins near the SR 92 intersection, extending east to Guilio Cesare Road. KE&G Construction will be installing roadway lighting, a HAWK crossing signal, and a shared use pathway located on the south side of the roadway. This project was designed to provide…

Read More

Kostka & Michigan Sewer Realignments

The Kostka & Michigan Sewer Realignments Project was awarded to KE&G by PCRWRD in February 2015. The project consists of replacing an 8-in waterline; installing, removing and replacing, and abandoning 13 manholes; installing 562 feet of new sewer main; abandoning 612 feet of existing sewer main and abandoning four existing house sewer connections and replacing…

Read More

22nd Street Sewer Augmentation

This project consists of the augmentation of approximately 1 mile of wastewater lines. The selected stretch to be augmented is along 22nd Street from Alvernon Way, downstream end, to Swan Rd, upstream end. The existing sewer line is 10 inches in diameter vitrified clay pipe (VCP) between Alvernon Way and Swan Rd. This project received…

Read More

South East Interceptor (SEI) Augmentation CMAR Project

Augmentation of existing Southeast Interceptor (SEI) by installation of 4 miles of 36-48 inch sewer through the jurisdiction of Tucson and South Tucson. Includes bypass pumping and relocation of several waterlines. For construction updates, traffic alerts and the latest news on this project, click here. PROJECT OVERVIEW Delivery Method: Construction Manager at Risk Location: Euclid…

Read More

City of Williams Water Meter Replacement

The Williams Water Meter Replacement project is in the final stage of meter installations. To date there has been nearly 1500 meters installed, which is more than what we expected to install. Our meter crews have discovered several meters during the installation process that the city did not know existed. Some of these meters have…

Read More