Hydrant Replacement Project

This contract involved the replacement of 29 hydrants throughout the City of Tombstone. We faced several challenges with this project, including working with various types of pipe and removing hydrants dated as far back as 1942. PROJECT OVERVIEW LOCATION: TOMBSTONE TYPE: WATER METER MORE PROJECTS

Read More

Southwest Gas Douglas Parking Lot Reconstruction

This project involved removing and replacing a 10,000-square-feet parking lot. Construction began in June with an accelerated schedule in order to be completed before the monsoon rains. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE: PARKING LOT CONSTRUCTION MORE PROJECTS

Read More

7th Street Pedestrian Crossing

This City of Sierra Vista project consists of installing a signalized pedestrian crossing on 7th street to allow the safe crossing for pedestrians. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE:   MORE PROJECTS

Read More

Myer School Track

This project consisted of the removal and replacement of a running track. Construction included milling, curb removal, earthwork, installation of 3,000 LF of curb, and 2,500 SY asphalt paving. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE: SCHOOL GROUNDS CONSTRUCTION MORE PROJECTS

Read More

Avenida Escuela Widening

Awarded by the City of Sierra Vista, this project included widening Avenida Escuela from two lanes to four lanes between Camino del Norte and SR-90. Construction included earthwork, installing culvert extensions, scuppers, 3,200 LF of curb and gutter, concrete driveways, 500 LF retaining wall, a bike path and paving 8,000 SY of asphalt. PROJECT OVERVIEW LOCATION: SIERRA…

Read More

Harrison Greenway Multi-Use Pathway

This project consists of improvements for a new 3.2 mile long, 12-foot-wide asphalt multi-use pathway. The pathway starting on the South side of Irvington at an existing crosswalk will continue South across Valencia and link up with Mesquite Elementary School. It is a fast paced project, with limited public impact, and promises to bring a…

Read More

Pantano Riverpath 5th Street to Speedway Boulevard

This project ran parallel to the Pantano Wash between the 5th St. Wash and Speedway Blvd. in Tucson. The project consisted of a 95-foot span prefabricated steel pedestrian bridge, as well as 1,250 feet of asphalt path, decomposed granite paths, a ramada shade shelter, various landscape features, and project artwork. PROJECT OVERVIEW LOCATION: TUCSON TYPE:…

Read More

ADOT SR-80 Tombstone

Arizona Department of Transportation began a long awaited project to improve pedestrian safety and the appearance of State Route 80 where it passes through historic Tombstone. The overall project included road improvements, and repairing damaged sections of historic buildings along Freemont Street. Freemont Street is located in the town’s historic district that comes with strict…

Read More

Stone Avenue – Speedway Blvd to Drachman St

Roadway reconstruction consists of new median islands, landscaping, a drainage structure, curb, sidewalk, curb access ramps, driveways, and street lighting. New traffic signals will be installed at the Drachman and Speedway intersections and three new bus pullouts will be constructed. In addition, a new water distribution system will be constructed and the old system removed. PROJECT OVERVIEW…

Read More

Davis Road: SR-80 to US-191

Davis Road is an Arizona Department of Transporation Project that is located in Cochise County just east of Tombstone, Arizona. The main portion of this project begins at mile post 9.9 on Davis Road. KE&G was awarded this project on December 1, 2016 after several weeks of delay due to archeological findings in the area…