Transportation Projects
Sierra Dental
The Sierra Dental project was site work for this facility and completed by our Sierra Vista Team. The team included Ben Carter, John Drake, Cesar Acuna, Rick McMahon, and Ramon Morales. The scope of work included installation of SWPPP BMP’s, removal of existing parking lot & improvements, cut to export 5400 CY, 100’ 4” sewer with clean-outs,…
Read MoreINA ROAD AT SR-77 INTERSECTION IMPROVEMENT
KE&G working for the Pima County Department of Transportation in conjunction with the Regional Transportation Authority, Town of Oro Valley, and Arizona Department of Transportation; the Ina Road at SR77 (Oracle Road) project is nearing completion. This will be the first ever indirect left intersection to be constructed in the state of Arizona. This intersection…
Read MoreADOT SR-90 (SR-92 to Giulio Cesare Avenue)
Awarded in September 2014 by the City of Sierra Vista, this project runs along SR-90 and begins near the SR 92 intersection, extending east to Guilio Cesare Road. KE&G Construction will be installing roadway lighting, a HAWK crossing signal, and a shared use pathway located on the south side of the roadway. This project was designed to provide…
Read MoreSouthwest Gas Douglas Parking Lot Reconstruction
This project involved removing and replacing a 10,000-square-feet parking lot. Construction began in June with an accelerated schedule in order to be completed before the monsoon rains. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE: PARKING LOT CONSTRUCTION MORE PROJECTS
Read More7th Street Pedestrian Crossing
This City of Sierra Vista project consists of installing a signalized pedestrian crossing on 7th street to allow the safe crossing for pedestrians. PROJECT OVERVIEW LOCATION: SIERRA VISTA TYPE: MORE PROJECTS
Read MoreAvenida Escuela Widening
Awarded by the City of Sierra Vista, this project included widening Avenida Escuela from two lanes to four lanes between Camino del Norte and SR-90. Construction included earthwork, installing culvert extensions, scuppers, 3,200 LF of curb and gutter, concrete driveways, 500 LF retaining wall, a bike path and paving 8,000 SY of asphalt. PROJECT OVERVIEW LOCATION: SIERRA…
Read MoreHarrison Greenway Multi-Use Pathway
This project consists of improvements for a new 3.2 mile long, 12-foot-wide asphalt multi-use pathway. The pathway starting on the South side of Irvington at an existing crosswalk will continue South across Valencia and link up with Mesquite Elementary School. It is a fast paced project, with limited public impact, and promises to bring a…
Read MorePantano Riverpath 5th Street to Speedway Boulevard
This project ran parallel to the Pantano Wash between the 5th St. Wash and Speedway Blvd. in Tucson. The project consisted of a 95-foot span prefabricated steel pedestrian bridge, as well as 1,250 feet of asphalt path, decomposed granite paths, a ramada shade shelter, various landscape features, and project artwork. PROJECT OVERVIEW LOCATION: TUCSON TYPE:…
Read MoreADOT SR-80 Tombstone
Arizona Department of Transportation began a long awaited project to improve pedestrian safety and the appearance of State Route 80 where it passes through historic Tombstone. The overall project included road improvements, and repairing damaged sections of historic buildings along Freemont Street. Freemont Street is located in the town’s historic district that comes with strict…
Read MoreStone Avenue – Speedway Blvd to Drachman St
Roadway reconstruction consists of new median islands, landscaping, a drainage structure, curb, sidewalk, curb access ramps, driveways, and street lighting. New traffic signals will be installed at the Drachman and Speedway intersections and three new bus pullouts will be constructed. In addition, a new water distribution system will be constructed and the old system removed. PROJECT OVERVIEW…