Harrison Greenway Multi-Use Pathway

Harrison Pathway
Harrison Bike Path

This project consists of improvements for a new 3.2 mile long, 12-foot-wide asphalt multi-use pathway. The pathway starting on the South side of Irvington at an existing crosswalk will continue South across Valencia and link up with Mesquite Elementary School. It is a fast paced project, with limited public impact, and promises to bring a safer exercising and leisure element to the area.

PROJECT OVERVIEW

LOCATION: TUCSON

TYPE: ROADWAY CONSTRUCTION

kegesoplogo