Building Better Roads and Reliable Infrastructure for Safford
KE&G partnered with the City of Safford to deliver more than $3.1 million in roadway and underground utility improvements along Hollywood Road. The project combined roadway reconstruction, water and sewer infrastructure, drainage improvements, and culvert expansion to support the surrounding community.
With 90% of the work self-performed, KE&G's crews managed multiple phases of construction, from underground utility installation to final asphalt paving.
Navigating Complex Underground Infrastructure
One of the project's greatest challenges was working around existing underground utilities, including lines with uncertain locations and depths.
KE&G crews conducted extensive utility locating and potholing throughout construction to identify existing infrastructure and coordinate new installations.
The project included installing new sewer infrastructure, constructing three manholes, and connecting to two active sewer systems. These operations required careful coordination, wastewater diversion, and confined-space access.
Water improvements included new service connections for homes along Hollywood Road, 12-inch valves connecting to adjacent roadways, and a connection between the existing and new water mains.
Improving Drainage and Roadway Conditions
Beyond underground utilities, the project included expanding an existing culvert crossing over a wash northeast of the highway.
Crews installed concrete culvert sections, coordinated aboveground pipeline fabrication, and completed additional improvements around the crossing.
Once underground construction was complete, KE&G crews prepared the roadway through grading and compaction before placing aggregate base and asphalt.
Additional improvements included curb work, fog seal, utility access adjustments, and handrail installation along portions of the sidewalk and culvert crossing.
Built by KE&G Employee Owners
From underground utility installation to roadway construction, KE&G's employee owners completed 90% of the project with their own crews.
The Hollywood Road improvements demonstrate the breadth of KE&G's self-perform capabilities and our commitment to supporting infrastructure development in Safford and Graham County.
Through collaboration with the City of Safford, Bowman Consulting, and our project partners, KE&G helped deliver improvements to the roadway, water, sewer, and drainage infrastructure serving the Hollywood Road corridor.
Building the infrastructure that moves Southern Arizona forward.