Ray Tailings Bypass Pipeline

This project included the installation of approximately 14,000 LF of new 24” HDPE SDR 9 tailings bypass pipeline.  The earthwork was necessary to build a pipe bed that evens out the terrain of the tailings bench and provides an adequate surface.  The culmination of the project was the relocation of a valve station, including multiple 24” knife gate valves, and replacing urethane-lined steel pipe spools.  Due to the creative planning of the field team this was a successful project despite numerous challenges.