This project included the installation of approximately 14,000 LF of new 24” HDPE SDR 9 tailings bypass pipeline. The earthwork was necessary to build a pipe bed that evens out the terrain of the tailings bench and provides an adequate surface. The culmination of the project was the relocation of a valve station, including multiple 24” knife gate valves, and replacing urethane-lined steel pipe spools. Due to the creative planning of the field team this was a successful project despite numerous challenges.