Southern Az. Division Manager
Project Manager/Estimator
Project Manager
The North Garden Avenue and Fry Boulevard project included 700 tons of asphalt; 400 linear feet of storm drain; eight catch basins; new striping; new signalized intersections; 50,000 square feet of decomposed granite; first decorative stamped asphalt intersection and crosswalks in Cochise County; 50,000 square feet of new sidewalk and colored multi-use path; 18 handicap… Continue reading North Garden Avenue and Fry Boulevard Improvements City of Sierra Vista
Phase 2 of the Tombstone High School Field Improvements Project is underway with ground-up construction performed by KE&G, including site utilities, fencing, irrigation, infield sand, bases, and pitching rubbers as well as brand new sod for both the baseball and softball fields.
Cochise College, in collaboration with the City of Sierra Vista, created a project to assist in training local emergency services on high-speed tactical driving. This project consisted of approximately 5 acres of 6.5” thick concrete, a rip rap detention basin, a small parking lot, and a covered shade structure for the emergency service members to… Continue reading Cochise College Driving Track
This project consisted of a complete overlay of Adams Ave. and Garden Ave. in Bisbee, AZ. The overlay was completed using a small paver and small roller as these streets were only a total of 10ft wide for both lanes of traffic. This project was extremely important to the City of Bisbee as Adams Ave.… Continue reading City of Bisbee – Adams and Garden Overlay
KE&G Construction, Inc. was a subcontractor on this project for Harris United. KE&G completed the site work for this project, including site utilities, earthwork and excavation, placement and compaction of ABC, asphalt paving, and roadway stripping. This is the first Loves in the Willcox area and required a joint effort with ADOT, Cochise County, and… Continue reading Loves Travel Stop – Willcox, AZ
This project consisted of removing and replacing 27,620 SF concrete sidewalks and 3,902 SY of asphalt paving regarding the site, placing decomposed granite in landscape areas, installation of 1,776 LF underground storm drain system, twenty-seven catch basins, removal and replacement of chain link fence, and installation of decorative fence. Project Manager Ben Carter and Superintendent… Continue reading Huachuca City RD Grading and Drainage
KE&G is a respected 100% employee-owned company that is committed to delivering safe, high-quality projects that exceed the expectations of our clients