CORONADO-WIDENING

CORONADO WIDENING

In May of 2013, the City of Sierra Vista awarded KE&G the project known as Coronado Widening. The project runs along Coronado Drive from Carmelita to the Highway 90 By-Pass which travels in front of the City of Sierra Vista, City Hall and Police Station. Project Manager, Larry Saunders spearheaded this project along with Superintendent,… Continue reading CORONADO WIDENING

PROJECT OVERVIEW

Location : SIERRA VISTA
Type : ROADWAY CONSTRUCTION
View Project

Avenida Escuela Extension

Awarded by the City of Sierra Vista, this project included widening Avenida Escuela from two lanes to four lanes between Camino del Norte and SR-90. Construction included earthwork, installing culvert extensions, scuppers, 3,200 LF of curb and gutter, concrete driveways, 500 LF retaining wall, a bike path and paving 8,000 SY of asphalt.

PROJECT OVERVIEW

Location : SIERRA VISTA
Type : ROADWAY CONSTRUCTION
View Project

North Garden Avenue and Fry Boulevard Improvements City of Sierra Vista

The North Garden Avenue and Fry Boulevard project included 700 tons of asphalt; 400 linear feet of storm drain; eight catch basins; new striping; new signalized intersections; 50,000 square feet of decomposed granite; first decorative stamped asphalt intersection and crosswalks in Cochise County; 50,000 square feet of new sidewalk and colored multi-use path; 18 handicap… Continue reading North Garden Avenue and Fry Boulevard Improvements City of Sierra Vista

PROJECT OVERVIEW

Location : Sierra Vista
Type : Transportation
View Project
ADOT-SR-90-(SR-92-to-Giulio-Cesare-Avenue)

ADOT SR-90 (SR-92 to Giulio Cesare Avenue)

Awarded in September 2014 by the City of Sierra Vista, this project runs along SR-90 and begins near the SR 92 intersection, extending east to Guilio Cesare Road. KE&G Construction will be installing roadway lighting, a HAWK crossing signal, and a shared use pathway located on the south side of the roadway. This project was designed to provide… Continue reading ADOT SR-90 (SR-92 to Giulio Cesare Avenue)

PROJECT OVERVIEW

Location : SIERRA VISTA
Type : ROADWAY CONSTRUCTION
View Project

Phase 2 of the Tombstone High School Field Improvements

Phase 2 of the Tombstone High School Field Improvements Project is underway with ground-up construction performed by KE&G, including site utilities, fencing, irrigation, infield sand, bases, and pitching rubbers as well as brand new sod for both the baseball and softball fields.

PROJECT OVERVIEW

Location : Tombstone
Type : Site work
View Project
Benson-Stein-Pass-Highway-(Texas-Canyon-Rest-Area)

Benson-Stein Pass Highway (Texas Canyon Rest Area)

This project is located in Cochise County along Interstate 10 at milepost 320, approximately 15 miles east of the City of Benson. The work included upgrading equipment in the restrooms, pump house, ramadas, and well site, in addition to sewer system rehabilitation. Construction included installing six new evaporation pond liners, waterline distribution replacement, micro surfacing… Continue reading Benson-Stein Pass Highway (Texas Canyon Rest Area)

PROJECT OVERVIEW

Location : COCHISE COUNTY
View Project

Bay Acres

Located just outside the main streets of Douglas, Bay Acres is a community that was initially an unincorporated county island. The small lots in this area and extensive use of septic tanks caused ongoing issues in homeowners yards and in some of the homes. Numerous homes had septic tanks that were leaking sewage and contaminating… Continue reading Bay Acres

PROJECT OVERVIEW

Location : Douglas
Type : Site work
View Project
Sierra-Dental

Sierra Dental

The Sierra Dental project was site work for this facility and completed by our Sierra Vista Team. The team included Ben Carter, John Drake, Cesar Acuna, Rick McMahon, and Ramon Morales. The scope of work included installation of SWPPP BMP’s, removal of existing parking lot & improvements, cut to export 5400 CY, 100’ 4” sewer with clean-outs,… Continue reading Sierra Dental

PROJECT OVERVIEW

Location : SIERRA VISTA
Type : SITE WORK
View Project