North Garden Avenue and Fry Boulevard Improvements City of Sierra Vista

The North Garden Avenue and Fry Boulevard project included 700 tons of asphalt; 400 linear feet of storm drain; eight catch basins; new striping; new signalized intersections; 50,000 square feet of decomposed granite; first decorative stamped asphalt intersection and crosswalks in Cochise County; 50,000 square feet of new sidewalk and colored multi-use path; 18 handicap… Continue reading North Garden Avenue and Fry Boulevard Improvements City of Sierra Vista

PROJECT OVERVIEW

Location : Sierra Vista
Type : Transportation
View Project

Phase 2 of the Tombstone High School Field Improvements

Phase 2 of the Tombstone High School Field Improvements Project is underway with ground-up construction performed by KE&G, including site utilities, fencing, irrigation, infield sand, bases, and pitching rubbers as well as brand new sod for both the baseball and softball fields.

PROJECT OVERVIEW

Location : Tombstone
Type : Site work
View Project

Cochise College Driving Track

Cochise College, in collaboration with the City of Sierra Vista, created a project to assist in training local emergency services on high-speed tactical driving. This project consisted of approximately 5 acres of 6.5” thick concrete, a rip rap detention basin, a small parking lot, and a covered shade structure for the emergency service members to… Continue reading Cochise College Driving Track

PROJECT OVERVIEW

Location : Sierra Vista, AZ
View Project

City of Bisbee – Adams and Garden Overlay

PROJECT OVERVIEW

Location : City of Bisbee
Description : KE&G completed a full asphalt overlay of Adams Avenue and Garden Avenue in Bisbee, delivering roadway improvements on two of the city’s most constrained and high-use streets. The project required precise paving operations, as both roadways measure approximately 10 feet wide across two lanes, limiting equipment access and requiring a highly controlled approach. To maintain quality and consistency in a restricted environment, KE&G utilized a small paver and compact roller, allowing the crew to complete the overlay efficiently while meeting performance standards. This approach ensured proper compaction, smooth surface finish, and long-term durability despite the narrow roadway conditions. Adams Avenue serves as a critical route for the annual Bisbee 1000, making the success of this project especially important to the City of Bisbee. The upgraded roadway supports both daily traffic and large-scale community events, improving safety, drivability, and overall infrastructure reliability. This project reflects KE&G’s ability to adapt to challenging site conditions, self-perform specialized paving work, and deliver results that meet the needs of both municipalities and the communities they serve. Project leadership included Project Manager Justin Wilson, Field Engineer Jesus Quiroz, and Paving Superintendent Ramon Morales.
View Project

Loves Travel Stop – Willcox, AZ

KE&G Construction, Inc. was a subcontractor on this project for Harris United. KE&G completed the site work for this project, including site utilities, earthwork and excavation, placement and compaction of ABC, asphalt paving, and roadway stripping. This is the first Loves in the Willcox area and required a joint effort with ADOT, Cochise County, and… Continue reading Loves Travel Stop – Willcox, AZ

PROJECT OVERVIEW

Location : Willcox, AZ
View Project

Huachuca City RD Grading and Drainage

This project consisted of removing and replacing 27,620 SF concrete sidewalks and 3,902 SY of asphalt paving regarding the site, placing decomposed granite in landscape areas, installation of 1,776 LF underground storm drain system, twenty-seven catch basins, removal and replacement of chain link fence, and installation of decorative fence. Project Manager Ben Carter and Superintendent… Continue reading Huachuca City RD Grading and Drainage